Cost to Build a Pool in Texas (2026): Inground Pool Prices Explained
In 2026 the typical cost to build a pool in Texas is $84,704 ($165 per square foot of water surface), with most real quotes landing between $74,540 and $97,410. We priced a standard project (a 32 × 16 ft concrete (gunite) pool, about 19,000 gallons, with a concrete deck and safety fence) line by line using Texas labor rates and local material costs.
Texas ranks 45th of 51 states for this project, one of the most affordable states, and sits 7% below the national average of $91,082. This guide walks through what drives that number, line by line, and what to check locally before you sign a contract.
Texas at a glance (November 2026)
- Texas average: $84,704 (about $165 per square foot of water surface)
- Typical range: $74,540 – $97,410
- U.S. average: $91,082 (-7% for Texas)
- Rank: 45 of 51 states (1 = most expensive)
- Labor: about 340 hours, $16,823 before markup

Cost to build a pool in Texas by size

| Project size | Estimated cost in Texas |
|---|---|
| 24 × 12 ft | $68,451 |
| 32 × 16 ft | $84,704 |
| 40 × 20 ft | $103,261 |
Size matters too: from 24 × 12 ft ($68,451) to 40 × 20 ft ($103,261). The cost per unit falls as the project grows, because permits, setup and fixed items are spread over more area.
Change the size, finish level and options to get your own itemized estimate for Texas, with a PDF you can show contractors.
Texas vs. nearby states
Texas ranks 45th of 51 states for swimming pool cost (1 = most expensive) — among the most affordable. Prices in neighboring states for the same project: Arkansas ($81,647, -4%), Louisiana ($85,942, +1%), New Mexico ($85,798, +1%) and Oklahoma ($82,637, -2%). Arkansas and Oklahoma are cheaper, while Louisiana and New Mexico cost more.

Wages explain most of the difference. The average carpenter wage in Texas is about $24.51 an hour, and the installed rate a contractor charges is roughly twice the wage. Sales tax on materials is 6.25% at the state level, and local add-ons can raise it.
Where the money goes
Before contingency, overhead and tax, the direct cost in Texas splits into materials ($38,003), labor ($16,823 for about 340 hours) and equipment, disposal and permits ($10,256). By work package:
- Pool structure: $32,239 (50%)
- Design, permits & excavation: $10,468 (16%)
- Plumbing & equipment: $7,673 (12%)
- Safety fence & gate: $5,685 (9%)
- Pool deck: $5,030 (8%)
- Electrical: $2,774 (4%)
- Start-up: $1,213 (2%)

The final price adds 10% contingency for surprises, 15% contractor overhead and profit, and sales tax on materials. A quote far below the estimate usually leaves something out, so ask for an itemized scope in writing.
Labor rates in Texas
These are the trades and hours behind the estimate. The wage is the state average from the BLS Occupational Employment and Wage Statistics; the installed rate is what a contractor typically bills per hour.
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Cement mason / concrete finisher | 114 | $23.69 | $47.38 |
| Brick / block mason | 58 | $26.03 | $52.06 |
| Ironworker / welder | 40 | $27.28 | $54.56 |
| Construction laborer | 32 | $20.63 | $41.26 |
| Plumber | 32 | $29.22 | $58.44 |
| Fence erector | 26 | $19.01 | $38.02 |
| Equipment operator | 22 | $25.84 | $51.68 |
| Electrician | 16 | $28.50 | $57.00 |
Local factors that change the cost to build a pool in Texas
Climate, soil and local code change what has to be built in Texas, and therefore what it costs:
- Hurricane-force winds. Screen enclosures and equipment pads must be wind-rated; many owners add a pool cage, which is priced separately.
- Expansive / reactive clay soils. Expansive clay soil swells and shrinks with moisture: expect more rebar, a thicker or post-tensioned slab, and good drainage.
- Hot summers. A long swim season makes pools popular; plan for shade, a variable-speed pump and evaporation.

Permits and contractor licensing in Texas
- Contractor license. Texas has no statewide license for general or remodeling contractors. Plumbers are licensed by the Texas State Board of Plumbing Examiners, and electricians and HVAC contractors by the Texas Department of Licensing and Regulation (TDLR).
- Building code. Cities enforce the International Residential Code (the edition varies by city). Unincorporated county areas have few building rules, so check what applies at your address.
- Permits. Permits are issued by the city. In the 14 coastal counties, windstorm certification from the Texas Department of Insurance is needed to keep TWIA wind coverage.
Rules change, and cities often add their own requirements. Confirm with your local building department before work starts, and keep copies of the permit and final inspection: buyers, lenders and insurers ask for them.
What the estimate includes and leaves out
The cost to build a pool in Texas in this guide covers:
- Design, permits and excavation
- Concrete (gunite) shell with rebar
- Plaster interior finish and waterline tile
- Pump, filter, plumbing and skimmers
- Electrical work and bonding
- Concrete pool deck around the pool
- Code-required safety fence and self-closing gate
- Start-up chemicals and first fill
Budget separately for:
- Screen enclosure or pool cage
- Heater, salt system, automation and lighting upgrades
- Landscaping, outdoor kitchen and extra decking
- Removing rock or hauling large amounts of soil
- Higher insurance premiums and yearly maintenance
How to lower the cost
- A simple rectangle costs less to dig, form and cover than a freeform shape.
- Fiberglass or vinyl liner pools cost less up front than gunite, but have size and lifespan limits.
- Keep the deck small at first; it can be extended later.
- Choose a variable-speed pump; it costs more but saves on electricity every month.
- Build in the off-season when crews have openings.
- Check setback, easement and HOA rules before design to avoid redesign fees.
Before hiring, compare at least three written quotes against your itemized Texas estimate. Ask each contractor for a license number, proof of liability insurance and workers’ compensation, and a payment schedule tied to finished work, not dates.
Running costs after the build
Budget for the pool you will own, not just the one you build. Electricity for the pump, chemicals, cleaning and opening/closing typically run $1,000 to $3,000 a year, more with a heater. A variable-speed pump and a cover cut both energy use and evaporation.
A pool also changes insurance: most insurers want a code-compliant fence with a self-closing, self-latching gate, and many recommend raising liability coverage. Check with your agent before the design is final, because the rules can change what you build.
Timeline and planning
A gunite pool usually takes 8 to 12 weeks from excavation to swimming, plus 2 to 8 weeks for design, HOA approval and permits. Rain, inspections and curing time add to the schedule.
For more context, see the swimming pool cost calculator, all Texas construction and remodeling costs. Our construction cost index shows how Texas compares across 23 project types.
How we calculate these numbers. Every figure on this page comes from the SquareCosts calculators, which price each project line by line: materials adjusted for regional prices and inflation, labor hours multiplied by local trade wages, equipment, disposal and permits, then 10% contingency, 15% contractor overhead and profit, and sales tax on materials. Wages come from government statistics agencies and are re-checked every month. The Texas estimate assumes a 32 × 16 ft concrete (gunite) pool, about 19,000 gallons, with a concrete deck and safety fence. See our data sources for details. These are planning estimates, not quotes: always get written quotes from licensed contractors.
Frequently asked questions
How much does an inground pool cost in Texas in 2026?
About $84,704 for the standard project (a 32 × 16 ft concrete (gunite) pool, about 19,000 gallons, with a concrete deck and safety fence). Most quotes fall between $74,540 and $97,410.
Why is Texas less expensive than the U.S. average?
Texas is 7% below the national average of $91,082. The difference comes mainly from local wages (a carpenter earns about $24.51 per hour), regional material prices and the 6.25% sales tax on materials.
Do I need a licensed contractor in Texas?
Texas has no statewide license for general or remodeling contractors. Plumbers are licensed by the Texas State Board of Plumbing Examiners, and electricians and HVAC contractors by the Texas Department of Licensing and Regulation (TDLR).
Do I need a permit in Texas?
Permits are issued by the city. In the 14 coastal counties, windstorm certification from the Texas Department of Insurance is needed to keep TWIA wind coverage. Ask the contractor to pull the permit in their own name.
How long does the project take?
A gunite pool usually takes 8 to 12 weeks from excavation to swimming, plus 2 to 8 weeks for design, HOA approval and permits. Rain, inspections and curing time add to the schedule.