Washington construction & remodeling cost calculators (2026)
Every calculator below uses Washington labor rates, regional material prices and Sales tax (materials) (6.5%). Prices in USD, updated November 2026.
New construction
New Home ConstructionFull build cost: foundation, framing, roof, MEP and finishes.from ~$409kHome AdditionBedroom, family room or bathroom addition with tie-in to the house.from ~$91.1kGarage ConstructionDetached or attached garage: slab, framing, roof, doors, electrical.from ~$42.6k
Remodeling
Whole-Home RenovationApartment or house renovation, from bare shell to move-in ready.from ~$102kBathroom RemodelDemolition, waterproofing, tile, fixtures, vanity and lighting.from ~$13.5kKitchen RemodelCabinets, countertops, backsplash, appliances, flooring and lighting.from ~$42.8kBasement FinishingFraming, insulation, drywall, flooring, egress windows and a bathroom.from ~$59.3k
Roof & exterior
Roof ReplacementTear-off, decking repair, underlayment, shingles / metal / tile.from ~$16.5kSiding ReplacementVinyl, fiber cement, wood or stucco siding including trim and wrap.from ~$26.5kWindow ReplacementVinyl, fiberglass, wood or aluminum windows and patio doors.from ~$15.6kExterior PaintingPressure washing, scraping, priming and two coats on siding and trim.from ~$8,622
Pools, fences & outdoor
Swimming PoolConcrete, vinyl or fiberglass in-ground pool with equipment and deck.from ~$91.1kWood & Vinyl FencePrivacy or picket fence: posts, concrete, rails, pickets and gates.from ~$7,201Iron & Metal FenceWrought iron, steel, aluminum or chain link with gates and openers.from ~$14.6kBlock Wall FenceConcrete block (CMU) wall with footing, rebar, grout, cap and stucco.from ~$22.1kConcrete Driveway & SlabDriveway, patio or slab: base, reinforcement, ready-mix and finish.from ~$11.2kPaver PatioExcavation, gravel base, sand, pavers, edging and polymeric sand.from ~$6,288Deck BuildingFootings, framing, decking, railings and stairs in wood or composite.from ~$11.9k
Floors, walls & systems
Flooring InstallationLaminate, vinyl plank, hardwood, carpet or tile including removal.from ~$5,269Interior PaintingWalls, ceilings, trim and doors: prep, primer and paint.from ~$8,862Drywall InstallationHang, tape, finish and prime drywall for walls and ceilings.from ~$6,174HVAC ReplacementFurnace + AC, heat pump or ductless mini-split with ductwork.from ~$13.7kElectrical Rewiring & PanelPanel upgrade, full or partial rewire, outlets, lighting, EV charger.from ~$31.3k
Typical project costs in Washington
| Project | Typical cost | Range |
|---|---|---|
| New Home Construction | $464,041 | $408,356 – $533,647 |
| Home Addition | $100,582 | $88,512 – $115,669 |
| Garage Construction | $43,782 | $38,528 – $50,349 |
| Whole-Home Renovation | $121,646 | $107,048 – $139,893 |
| Bathroom Remodel | $18,035 | $15,871 – $20,740 |
| Kitchen Remodel | $52,311 | $46,034 – $60,158 |
| Basement Finishing | $66,145 | $58,208 – $76,067 |
| Roof Replacement | $18,752 | $16,502 – $21,565 |
| Siding Replacement | $29,569 | $26,021 – $34,004 |
| Window Replacement | $17,703 | $15,579 – $20,358 |
| Exterior Painting | $9,221 | $8,114 – $10,604 |
| Swimming Pool | $103,544 | $91,119 – $119,076 |
| Wood & Vinyl Fence | $8,183 | $7,201 – $9,410 |
| Iron & Metal Fence | $16,604 | $14,612 – $19,095 |
| Block Wall Fence | $25,119 | $22,105 – $28,887 |
| Concrete Driveway & Slab | $12,775 | $11,242 – $14,691 |
| Paver Patio | $7,145 | $6,288 – $8,217 |
| Deck Building | $13,469 | $11,853 – $15,489 |
| Flooring Installation | $6,584 | $5,794 – $7,572 |
| Interior Painting | $9,499 | $8,359 – $10,924 |
| Drywall Installation | $7,016 | $6,174 – $8,068 |
| HVAC Replacement | $15,588 | $13,717 – $17,926 |
| Electrical Rewiring & Panel | $35,613 | $31,339 – $40,955 |
Washington labor rates (2026)
| Trade | Average wage / hour | Installed rate / hour* |
|---|---|---|
| Carpenter | $38.06 | $76.12 |
| Electrician | $45.42 | $90.84 |
| Plumber | $42.69 | $85.38 |
| Construction laborer | $29.48 | $58.96 |
| Painter | $29.28 | $58.56 |
| Roofer | $33.11 | $66.22 |
| Tile & stone setter | $38.01 | $76.02 |
| Cement mason / concrete finisher | $39.37 | $78.74 |
| Drywall installer | $38.68 | $77.36 |
| HVAC technician | $37.91 | $75.82 |
| Brick / block mason | $41.07 | $82.14 |
| Floor layer | $36.85 | $73.70 |
| Fence erector | $30.14 | $60.28 |
| Glazier / window installer | $35.63 | $71.26 |
| Insulation worker | $32.66 | $65.32 |
| Equipment operator | $39.55 | $79.10 |
| Ironworker / welder | $41.93 | $83.86 |
| Landscaper / hardscape | $25.23 | $50.46 |
* Average wage × 2 for payroll taxes, insurance, vehicles, tools and non-billable time.
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.