Maryland construction & remodeling cost calculators (2026)
Every calculator below uses Maryland labor rates, regional material prices and Sales tax (materials) (6%). Prices in USD, updated November 2026.
New construction
New Home ConstructionFull build cost: foundation, framing, roof, MEP and finishes.from ~$363kHome AdditionBedroom, family room or bathroom addition with tie-in to the house.from ~$81.6kGarage ConstructionDetached or attached garage: slab, framing, roof, doors, electrical.from ~$38.5k
Remodeling
Whole-Home RenovationApartment or house renovation, from bare shell to move-in ready.from ~$85.2kBathroom RemodelDemolition, waterproofing, tile, fixtures, vanity and lighting.from ~$11.3kKitchen RemodelCabinets, countertops, backsplash, appliances, flooring and lighting.from ~$39.2kBasement FinishingFraming, insulation, drywall, flooring, egress windows and a bathroom.from ~$51.4k
Roof & exterior
Roof ReplacementTear-off, decking repair, underlayment, shingles / metal / tile.from ~$15.3kSiding ReplacementVinyl, fiber cement, wood or stucco siding including trim and wrap.from ~$23.9kWindow ReplacementVinyl, fiberglass, wood or aluminum windows and patio doors.from ~$14.3kExterior PaintingPressure washing, scraping, priming and two coats on siding and trim.from ~$7,981
Pools, fences & outdoor
Swimming PoolConcrete, vinyl or fiberglass in-ground pool with equipment and deck.from ~$80.5kWood & Vinyl FencePrivacy or picket fence: posts, concrete, rails, pickets and gates.from ~$6,226Iron & Metal FenceWrought iron, steel, aluminum or chain link with gates and openers.from ~$13.4kBlock Wall FenceConcrete block (CMU) wall with footing, rebar, grout, cap and stucco.from ~$18.2kConcrete Driveway & SlabDriveway, patio or slab: base, reinforcement, ready-mix and finish.from ~$9,419Paver PatioExcavation, gravel base, sand, pavers, edging and polymeric sand.from ~$5,607Deck BuildingFootings, framing, decking, railings and stairs in wood or composite.from ~$10.8k
Floors, walls & systems
Flooring InstallationLaminate, vinyl plank, hardwood, carpet or tile including removal.from ~$4,349Interior PaintingWalls, ceilings, trim and doors: prep, primer and paint.from ~$8,165Drywall InstallationHang, tape, finish and prime drywall for walls and ceilings.from ~$4,841HVAC ReplacementFurnace + AC, heat pump or ductless mini-split with ductwork.from ~$13.0kElectrical Rewiring & PanelPanel upgrade, full or partial rewire, outlets, lighting, EV charger.from ~$25.9k
Typical project costs in Maryland
| Project | Typical cost | Range |
|---|---|---|
| New Home Construction | $415,599 | $365,727 – $477,939 |
| Home Addition | $90,701 | $79,817 – $104,306 |
| Garage Construction | $39,609 | $34,856 – $45,550 |
| Whole-Home Renovation | $103,804 | $91,348 – $119,375 |
| Bathroom Remodel | $15,671 | $13,790 – $18,022 |
| Kitchen Remodel | $48,347 | $42,545 – $55,599 |
| Basement Finishing | $57,973 | $51,016 – $66,669 |
| Roof Replacement | $17,348 | $15,266 – $19,950 |
| Siding Replacement | $26,876 | $23,651 – $30,907 |
| Window Replacement | $16,232 | $14,284 – $18,667 |
| Exterior Painting | $8,556 | $7,529 – $9,839 |
| Swimming Pool | $91,481 | $80,503 – $105,203 |
| Wood & Vinyl Fence | $7,075 | $6,226 – $8,136 |
| Iron & Metal Fence | $15,233 | $13,405 – $17,518 |
| Block Wall Fence | $20,649 | $18,171 – $23,746 |
| Concrete Driveway & Slab | $10,703 | $9,419 – $12,308 |
| Paver Patio | $6,372 | $5,607 – $7,328 |
| Deck Building | $12,300 | $10,824 – $14,145 |
| Flooring Installation | $5,610 | $4,937 – $6,452 |
| Interior Painting | $8,776 | $7,723 – $10,092 |
| Drywall Installation | $5,501 | $4,841 – $6,326 |
| HVAC Replacement | $14,808 | $13,031 – $17,029 |
| Electrical Rewiring & Panel | $29,414 | $25,884 – $33,826 |
Maryland labor rates (2026)
| Trade | Average wage / hour | Installed rate / hour* |
|---|---|---|
| Carpenter | $33.19 | $66.38 |
| Electrician | $36.28 | $72.56 |
| Plumber | $35.34 | $70.68 |
| Construction laborer | $23.24 | $46.48 |
| Painter | $26.76 | $53.52 |
| Roofer | $29.63 | $59.26 |
| Tile & stone setter | $23.72 | $47.44 |
| Cement mason / concrete finisher | $26.13 | $52.26 |
| Drywall installer | $26.50 | $53.00 |
| HVAC technician | $35.49 | $70.98 |
| Brick / block mason | $27.22 | $54.44 |
| Floor layer | $23.76 | $47.52 |
| Fence erector | $23.26 | $46.52 |
| Glazier / window installer | $27.50 | $55.00 |
| Insulation worker | $25.21 | $50.42 |
| Equipment operator | $30.52 | $61.04 |
| Ironworker / welder | $32.36 | $64.72 |
| Landscaper / hardscape | $19.47 | $38.94 |
* Average wage × 2 for payroll taxes, insurance, vehicles, tools and non-billable time.
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.