Kitchen Remodel Cost Calculator (2026)

The average kitchen remodel in the U.S. costs about $47,133 (typical range $41,477–$54,203). Prices below use national average wages — choose your state or province for local labor rates and taxes. Updated November 2026

Loading calculator…

Kitchen Remodel cost by state — United States (USD)

Most expensive: Hawaii ($63,143), Alaska ($58,011), California ($53,158). Least expensive: Alabama ($43,175), Arkansas ($43,356), Mississippi ($43,714).

StateTypical costRangeUnit price
Alabama$43,175$37,994 – $49,651$240 per sq ft
Alaska$58,011$51,050 – $66,713$322 per sq ft
Arizona$46,053$40,527 – $52,961$256 per sq ft
Arkansas$43,356$38,153 – $49,859$241 per sq ft
California$53,158$46,779 – $61,132$295 per sq ft
Colorado$47,379$41,694 – $54,486$263 per sq ft
Connecticut$50,981$44,863 – $58,628$283 per sq ft
Delaware$46,098$40,566 – $53,013$256 per sq ft
District of Columbia$51,326$45,167 – $59,025$285 per sq ft
Florida$45,516$40,054 – $52,343$253 per sq ft
Georgia$44,076$38,787 – $50,687$245 per sq ft
Hawaii$63,143$55,566 – $72,614$351 per sq ft
Idaho$46,241$40,692 – $53,177$257 per sq ft
Illinois$51,191$45,048 – $58,870$284 per sq ft
Indiana$46,657$41,058 – $53,656$259 per sq ft
Iowa$46,019$40,497 – $52,922$256 per sq ft
Kansas$45,584$40,114 – $52,422$253 per sq ft
Kentucky$44,951$39,557 – $51,694$250 per sq ft
Louisiana$44,592$39,241 – $51,281$248 per sq ft
Maine$48,937$43,065 – $56,278$272 per sq ft
Maryland$48,347$42,545 – $55,599$269 per sq ft
Massachusetts$52,750$46,420 – $60,663$293 per sq ft
Michigan$47,123$41,468 – $54,191$262 per sq ft
Minnesota$49,934$43,942 – $57,424$277 per sq ft
Mississippi$43,714$38,468 – $50,271$243 per sq ft
Missouri$46,442$40,869 – $53,408$258 per sq ft
Montana$46,482$40,904 – $53,454$258 per sq ft
Nebraska$45,506$40,045 – $52,332$253 per sq ft
Nevada$49,432$43,500 – $56,847$275 per sq ft
New Hampshire$46,460$40,885 – $53,429$258 per sq ft
New Jersey$51,946$45,712 – $59,738$289 per sq ft
New Mexico$45,194$39,771 – $51,973$251 per sq ft
New York$52,091$45,840 – $59,905$289 per sq ft
North Carolina$44,097$38,805 – $50,712$245 per sq ft
North Dakota$46,895$41,268 – $53,929$261 per sq ft
Ohio$46,614$41,020 – $53,606$259 per sq ft
Oklahoma$43,856$38,593 – $50,434$244 per sq ft
Oregon$48,232$42,444 – $55,467$268 per sq ft
Pennsylvania$48,446$42,632 – $55,713$269 per sq ft
Rhode Island$49,664$43,704 – $57,114$276 per sq ft
South Carolina$44,867$39,483 – $51,597$249 per sq ft
South Dakota$45,092$39,681 – $51,856$251 per sq ft
Tennessee$44,979$39,582 – $51,726$250 per sq ft
Texas$44,703$39,339 – $51,408$248 per sq ft
Utah$46,001$40,481 – $52,901$256 per sq ft
Vermont$48,651$42,813 – $55,949$270 per sq ft
Virginia$46,024$40,501 – $52,928$256 per sq ft
Washington$52,311$46,034 – $60,158$291 per sq ft
West Virginia$45,594$40,123 – $52,433$253 per sq ft
Wisconsin$47,544$41,839 – $54,676$264 per sq ft
Wyoming$46,800$41,184 – $53,820$260 per sq ft

Kitchen Remodel cost by province — Canada (CAD)

Most expensive: Nunavut (C$99,503), Northwest Territories (C$86,026), Yukon (C$81,264). Least expensive: Alberta (C$64,178), Saskatchewan (C$66,233), Manitoba (C$66,339).

ProvinceTypical costRangeUnit price
AlbertaC$64,178C$56,477 – C$73,805C$357 per sq ft
British ColumbiaC$71,779C$63,166 – C$82,546C$399 per sq ft
ManitobaC$66,339C$58,378 – C$76,290C$369 per sq ft
New BrunswickC$68,316C$60,118 – C$78,563C$380 per sq ft
Newfoundland and LabradorC$71,691C$63,088 – C$82,445C$398 per sq ft
Nova ScotiaC$69,097C$60,805 – C$79,462C$384 per sq ft
OntarioC$69,540C$61,195 – C$79,971C$386 per sq ft
Prince Edward IslandC$68,560C$60,333 – C$78,844C$381 per sq ft
QuebecC$69,804C$61,428 – C$80,275C$388 per sq ft
SaskatchewanC$66,233C$58,285 – C$76,168C$368 per sq ft
YukonC$81,264C$71,512 – C$93,454C$451 per sq ft
Northwest TerritoriesC$86,026C$75,703 – C$98,930C$478 per sq ft
NunavutC$99,503C$87,563 – C$114,428C$553 per sq ft

Kitchen Remodel cost by state — Australia (AUD)

Most expensive: Northern Territory (A$75,993), Western Australia (A$72,294), Australian Capital Territory (A$71,256). Least expensive: South Australia (A$66,683), Queensland (A$67,744), Victoria (A$68,267).

StateTypical costRangeUnit price
New South WalesA$69,822A$61,443 – A$80,295A$4,175 per m²
VictoriaA$68,267A$60,075 – A$78,507A$4,082 per m²
QueenslandA$67,744A$59,615 – A$77,906A$4,051 per m²
South AustraliaA$66,683A$58,681 – A$76,685A$3,988 per m²
Western AustraliaA$72,294A$63,619 – A$83,138A$4,323 per m²
TasmaniaA$68,771A$60,518 – A$79,087A$4,112 per m²
Northern TerritoryA$75,993A$66,874 – A$87,392A$4,544 per m²
Australian Capital TerritoryA$71,256A$62,705 – A$81,944A$4,261 per m²

How much does a kitchen remodel cost in the U.S.?

Based on current the U.S. labor rates and material prices, a typical kitchen remodel costs about $47,133. Most projects fall between $41,477 and $54,203, or roughly $262 per sq ft. This example assumes: kitchen area 180 sq ft, cabinet run 22 ft, cabinets Semi-custom, countertop Quartz.

Cost by finish level

Finish levelEstimated costTypical range
Economy (budget)$38,330$33,730 – $44,080
Standard (mid-range)$47,133$41,477 – $54,203
Premium (high-end)$62,448$54,954 – $71,815

Cost by project size

Project sizeEstimated cost
14 ft, 100 sq ft$34,461
22 ft, 180 sq ft$47,133
32 ft, 300 sq ft$63,744

Where the money goes

  • Cabinets & countertops$22,099 (61%)
  • Appliances$5,369 (15%)
  • Electrical & lighting$2,077 (6%)
  • Demolition & prep$1,903 (5%)
  • Plumbing & gas$1,590 (4%)
  • Flooring$1,143 (3%)
  • Backsplash$1,049 (3%)
  • Drywall repair & painting$885 (2%)

Materials $28,368 · Labor $6,925 (116 hours) · Equipment, disposal & permits $823 — before contingency, contractor overhead & profit and tax.

Labor rates for this project in the U.S. (national average)

TradeHoursAvg. wage / hourInstalled rate / hour
Carpenter36$31.55$63.10
Tile & stone setter22$28.49$56.98
Construction laborer22$25.02$50.04
Electrician15$34.37$68.74
Painter11$26.64$53.28
Plumber6$34.70$69.40
Floor layer5$29.69$59.38
  • Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
  • Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.

What a kitchen remodel includes

Cabinets and countertops are usually half of a kitchen budget. Appliances, backsplash, plumbing, lighting and flooring make up the rest. Changing the layout — moving the sink or range — adds plumbing, gas and electrical work.

Main cost factors

  • Cabinet length and grade
  • Countertop material
  • Appliance package
  • Changing the layout
  • Island and lighting

How to save money

  • Refacing or painting cabinets saves 50–70% compared to new cabinets.
  • Quartz and granite are similar in price; laminate is the budget choice.
  • Keep the sink, range and fridge in place to avoid moving utilities.
  • Buy appliances during holiday sales — packages often include free delivery.

Timeline

4–8 weeks, plus cabinet lead time.

Permits

Permits are needed for new circuits, plumbing or gas changes and wall removal.

Frequently asked questions

How much does a kitchen remodel cost in the US?

A typical kitchen remodel in the US costs about $47,133, with most projects between $41,477 and $54,203. Economy finishes start around $38,330 and premium projects reach $62,448. That is about $262 per sq ft.

How much of the cost is labor?

Labor is about 19% of the direct cost (116 work hours) for a typical project in the US. Materials are $28,368 and equipment, disposal and permits $823, before contingency, contractor overhead and tax.

How long does a kitchen remodel take?

4–8 weeks, plus cabinet lead time.

Do I need a permit for a kitchen remodel?

Permits are needed for new circuits, plumbing or gas changes and wall removal.

What is the most expensive part of a kitchen remodel?

Cabinets, followed by countertops and appliances.

How long do I need a temporary kitchen?

Plan for 4–8 weeks without a working kitchen.

Can I change the contractor markup or contingency?

Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.

More cost calculators

Choose your location

AL AlabamaAK AlaskaAZ ArizonaAR ArkansasCA CaliforniaCO ColoradoCT ConnecticutDE DelawareDC District of ColumbiaFL FloridaGA GeorgiaHI HawaiiID IdahoIL IllinoisIN IndianaIA IowaKS KansasKY KentuckyLA LouisianaME MaineMD MarylandMA MassachusettsMI MichiganMN MinnesotaMS MississippiMO MissouriMT MontanaNE NebraskaNV NevadaNH New HampshireNJ New JerseyNM New MexicoNY New YorkNC North CarolinaND North DakotaOH OhioOK OklahomaOR OregonPA PennsylvaniaRI Rhode IslandSC South CarolinaSD South DakotaTN TennesseeTX TexasUT UtahVT VermontVA VirginiaWA WashingtonWV West VirginiaWI WisconsinWY Wyoming