The average hvac replacement in the U.S. costs about $14,027 (typical range $12,344–$16,131). Prices below use national average wages — choose your state or province for local labor rates and taxes. Updated November 2026
Loading calculator…
HVAC Replacement cost by state — United States (USD)
Most expensive: Hawaii ($18,008), Alaska ($17,319), District of Columbia ($15,866). Least expensive: Alabama ($12,905), Arkansas ($12,958), Mississippi ($13,091).
| State | Typical cost | Range | Unit price |
|---|---|---|---|
| Alabama | $12,905 | $11,356 – $14,841 | $6 per sq ft |
| Alaska | $17,319 | $15,241 – $19,917 | $9 per sq ft |
| Arizona | $13,769 | $12,117 – $15,834 | $7 per sq ft |
| Arkansas | $12,958 | $11,403 – $14,902 | $6 per sq ft |
| California | $15,815 | $13,917 – $18,187 | $8 per sq ft |
| Colorado | $14,411 | $12,682 – $16,573 | $7 per sq ft |
| Connecticut | $15,288 | $13,453 – $17,581 | $8 per sq ft |
| Delaware | $13,885 | $12,219 – $15,968 | $7 per sq ft |
| District of Columbia | $15,866 | $13,962 – $18,246 | $8 per sq ft |
| Florida | $13,629 | $11,994 – $15,673 | $7 per sq ft |
| Georgia | $13,257 | $11,666 – $15,246 | $7 per sq ft |
| Hawaii | $18,008 | $15,847 – $20,709 | $9 per sq ft |
| Idaho | $13,890 | $12,223 – $15,974 | $7 per sq ft |
| Illinois | $15,168 | $13,348 – $17,443 | $8 per sq ft |
| Indiana | $13,963 | $12,287 – $16,057 | $7 per sq ft |
| Iowa | $13,771 | $12,118 – $15,837 | $7 per sq ft |
| Kansas | $13,661 | $12,022 – $15,710 | $7 per sq ft |
| Kentucky | $13,483 | $11,865 – $15,505 | $7 per sq ft |
| Louisiana | $13,446 | $11,832 – $15,463 | $7 per sq ft |
| Maine | $14,443 | $12,710 – $16,609 | $7 per sq ft |
| Maryland | $14,808 | $13,031 – $17,029 | $7 per sq ft |
| Massachusetts | $15,573 | $13,704 – $17,909 | $8 per sq ft |
| Michigan | $14,100 | $12,408 – $16,215 | $7 per sq ft |
| Minnesota | $14,912 | $13,123 – $17,149 | $7 per sq ft |
| Mississippi | $13,091 | $11,520 – $15,055 | $7 per sq ft |
| Missouri | $13,649 | $12,011 – $15,696 | $7 per sq ft |
| Montana | $13,848 | $12,186 – $15,925 | $7 per sq ft |
| Nebraska | $13,654 | $12,016 – $15,702 | $7 per sq ft |
| Nevada | $14,472 | $12,735 – $16,643 | $7 per sq ft |
| New Hampshire | $14,177 | $12,476 – $16,304 | $7 per sq ft |
| New Jersey | $15,512 | $13,651 – $17,839 | $8 per sq ft |
| New Mexico | $13,472 | $11,855 – $15,493 | $7 per sq ft |
| New York | $15,501 | $13,641 – $17,826 | $8 per sq ft |
| North Carolina | $13,308 | $11,711 – $15,304 | $7 per sq ft |
| North Dakota | $14,330 | $12,610 – $16,480 | $7 per sq ft |
| Ohio | $14,002 | $12,322 – $16,102 | $7 per sq ft |
| Oklahoma | $13,218 | $11,632 – $15,201 | $7 per sq ft |
| Oregon | $14,331 | $12,611 – $16,481 | $7 per sq ft |
| Pennsylvania | $14,348 | $12,626 – $16,500 | $7 per sq ft |
| Rhode Island | $14,952 | $13,158 – $17,195 | $7 per sq ft |
| South Carolina | $13,378 | $11,773 – $15,385 | $7 per sq ft |
| South Dakota | $13,655 | $12,016 – $15,703 | $7 per sq ft |
| Tennessee | $13,530 | $11,906 – $15,560 | $7 per sq ft |
| Texas | $13,503 | $11,883 – $15,528 | $7 per sq ft |
| Utah | $13,792 | $12,137 – $15,861 | $7 per sq ft |
| Vermont | $14,647 | $12,889 – $16,844 | $7 per sq ft |
| Virginia | $13,886 | $12,220 – $15,969 | $7 per sq ft |
| Washington | $15,588 | $13,717 – $17,926 | $8 per sq ft |
| West Virginia | $13,460 | $11,845 – $15,479 | $7 per sq ft |
| Wisconsin | $14,134 | $12,438 – $16,254 | $7 per sq ft |
| Wyoming | $13,827 | $12,168 – $15,901 | $7 per sq ft |
HVAC Replacement cost by province — Canada (CAD)
Most expensive: Nunavut (C$29,945), Northwest Territories (C$25,969), Yukon (C$24,541). Least expensive: Alberta (C$19,419), Saskatchewan (C$19,961), Manitoba (C$19,968).
| Province | Typical cost | Range | Unit price |
|---|---|---|---|
| Alberta | C$19,419 | C$17,089 – C$22,332 | C$10 per sq ft |
| British Columbia | C$21,718 | C$19,112 – C$24,976 | C$11 per sq ft |
| Manitoba | C$19,968 | C$17,572 – C$22,963 | C$10 per sq ft |
| New Brunswick | C$20,540 | C$18,075 – C$23,621 | C$10 per sq ft |
| Newfoundland and Labrador | C$21,593 | C$19,002 – C$24,832 | C$11 per sq ft |
| Nova Scotia | C$20,812 | C$18,315 – C$23,934 | C$10 per sq ft |
| Ontario | C$21,032 | C$18,508 – C$24,187 | C$11 per sq ft |
| Prince Edward Island | C$20,559 | C$18,092 – C$23,643 | C$10 per sq ft |
| Quebec | C$21,131 | C$18,595 – C$24,301 | C$11 per sq ft |
| Saskatchewan | C$19,961 | C$17,566 – C$22,955 | C$10 per sq ft |
| Yukon | C$24,541 | C$21,596 – C$28,222 | C$12 per sq ft |
| Northwest Territories | C$25,969 | C$22,853 – C$29,864 | C$13 per sq ft |
| Nunavut | C$29,945 | C$26,352 – C$34,437 | C$15 per sq ft |
HVAC Replacement cost by state — Australia (AUD)
Most expensive: Northern Territory (A$23,076), Western Australia (A$22,116), Australian Capital Territory (A$21,844). Least expensive: South Australia (A$20,359), Queensland (A$20,702), Victoria (A$20,855).
| State | Typical cost | Range | Unit price |
|---|---|---|---|
| New South Wales | A$21,340 | A$18,779 – A$24,541 | A$115 per m² |
| Victoria | A$20,855 | A$18,352 – A$23,983 | A$112 per m² |
| Queensland | A$20,702 | A$18,218 – A$23,807 | A$111 per m² |
| South Australia | A$20,359 | A$17,916 – A$23,413 | A$110 per m² |
| Western Australia | A$22,116 | A$19,462 – A$25,433 | A$119 per m² |
| Tasmania | A$20,908 | A$18,399 – A$24,044 | A$112 per m² |
| Northern Territory | A$23,076 | A$20,307 – A$26,537 | A$124 per m² |
| Australian Capital Territory | A$21,844 | A$19,223 – A$25,121 | A$118 per m² |
How much does a hvac replacement cost in the U.S.?
Based on current the U.S. labor rates and material prices, a typical hvac replacement costs about $14,027. Most projects fall between $12,344 and $16,131, or roughly $7 per sq ft. This example assumes: home size 2,000 sq ft, capacity 3.5 ton, system Gas furnace + central AC, efficiency High (16–17 SEER2 / 96% AFUE).
Cost by project size
| Project size | Estimated cost |
|---|---|
| 1,000 sq ft | $12,206 |
| 2,000 sq ft | $14,027 |
| 4,000 sq ft | $18,739 |
Where the money goes
- Equipment$7,304 (68%)
- Installation$2,395 (22%)
- Ductwork$827 (8%)
- Permit$241 (2%)
Materials $7,984 · Labor $2,268 (36 hours) · Equipment, disposal & permits $515 — before contingency, contractor overhead & profit and tax.
Labor rates for this project in the U.S. (national average)
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| HVAC technician | 32 | $31.14 | $62.28 |
| Electrician | 4 | $34.37 | $68.74 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a hvac replacement includes
HVAC cost depends on house size (system tonnage), system type, efficiency and how much ductwork needs work. Heat pumps and high-efficiency systems cost more up front but lower energy bills and often qualify for rebates.
Main cost factors
- Home size (system tonnage)
- System type
- Efficiency rating
- Ductwork condition
- Thermostat and zoning
How to save money
- Ask for a Manual J load calculation instead of sizing by rule of thumb.
- Sealing leaky ducts can save 20% on heating and cooling.
- Check federal, state and utility rebates for heat pumps.
- Replace furnace and AC together so the components match.
Timeline
1–3 days.
Permits
A mechanical permit and inspection are required for equipment replacement.
Frequently asked questions
How much does a hvac replacement cost in the US?
A typical hvac replacement in the US costs about $14,027, with most projects between $12,344 and $16,131. That is about $7 per sq ft.
How much of the cost is labor?
Labor is about 21% of the direct cost (36 work hours) for a typical project in the US. Materials are $7,984 and equipment, disposal and permits $515, before contingency, contractor overhead and tax.
How long does a hvac replacement take?
1–3 days.
Do I need a permit for a hvac replacement?
A mechanical permit and inspection are required for equipment replacement.
What size system do I need?
Roughly 1 ton per 500–600 sq ft — the calculator sizes it from your home area.
Heat pump or furnace + AC?
Heat pumps are more efficient in most climates; switch the system type to compare costs.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.