New Home Construction Cost Calculator (2026)
The average new home construction in the U.S. costs about $406,686 (typical range $357,884–$467,689). Prices below use national average wages — choose your state or province for local labor rates and taxes. Updated November 2026
Loading calculator…
New Home Construction cost by state — United States (USD)
Most expensive: Hawaii ($542,279), Alaska ($502,358), California ($465,765). Least expensive: Alabama ($355,449), Arkansas ($355,633), Mississippi ($355,995).
| State | Typical cost | Range | Unit price |
|---|---|---|---|
| Alabama | $355,449 | $312,795 – $408,766 | $178 per sq ft |
| Alaska | $502,358 | $442,075 – $577,712 | $251 per sq ft |
| Arizona | $388,354 | $341,752 – $446,607 | $194 per sq ft |
| Arkansas | $355,633 | $312,957 – $408,978 | $178 per sq ft |
| California | $465,765 | $409,873 – $535,630 | $233 per sq ft |
| Colorado | $408,247 | $359,257 – $469,484 | $204 per sq ft |
| Connecticut | $435,613 | $383,339 – $500,955 | $218 per sq ft |
| Delaware | $394,866 | $347,482 – $454,096 | $197 per sq ft |
| District of Columbia | $441,796 | $388,780 – $508,065 | $221 per sq ft |
| Florida | $375,222 | $330,195 – $431,505 | $188 per sq ft |
| Georgia | $365,981 | $322,063 – $420,878 | $183 per sq ft |
| Hawaii | $542,279 | $477,206 – $623,621 | $271 per sq ft |
| Idaho | $385,430 | $339,178 – $443,245 | $193 per sq ft |
| Illinois | $458,681 | $403,639 – $527,483 | $229 per sq ft |
| Indiana | $401,427 | $353,256 – $461,641 | $201 per sq ft |
| Iowa | $387,532 | $341,028 – $445,662 | $194 per sq ft |
| Kansas | $383,699 | $337,655 – $441,254 | $192 per sq ft |
| Kentucky | $375,870 | $330,766 – $432,251 | $188 per sq ft |
| Louisiana | $369,583 | $325,233 – $425,020 | $185 per sq ft |
| Maine | $410,850 | $361,548 – $472,478 | $205 per sq ft |
| Maryland | $415,599 | $365,727 – $477,939 | $208 per sq ft |
| Massachusetts | $464,048 | $408,362 – $533,655 | $232 per sq ft |
| Michigan | $403,853 | $355,391 – $464,431 | $202 per sq ft |
| Minnesota | $436,239 | $383,890 – $501,675 | $218 per sq ft |
| Mississippi | $355,995 | $313,276 – $409,394 | $178 per sq ft |
| Missouri | $405,103 | $356,491 – $465,868 | $203 per sq ft |
| Montana | $398,135 | $350,359 – $457,855 | $199 per sq ft |
| Nebraska | $379,350 | $333,828 – $436,253 | $190 per sq ft |
| Nevada | $422,978 | $372,221 – $486,425 | $211 per sq ft |
| New Hampshire | $403,227 | $354,840 – $463,711 | $202 per sq ft |
| New Jersey | $455,940 | $401,227 – $524,331 | $228 per sq ft |
| New Mexico | $379,932 | $334,340 – $436,922 | $190 per sq ft |
| New York | $456,373 | $401,608 – $524,829 | $228 per sq ft |
| North Carolina | $363,265 | $319,673 – $417,755 | $182 per sq ft |
| North Dakota | $395,151 | $347,733 – $454,424 | $198 per sq ft |
| Ohio | $401,909 | $353,680 – $462,195 | $201 per sq ft |
| Oklahoma | $361,079 | $317,750 – $415,241 | $181 per sq ft |
| Oregon | $429,813 | $378,235 – $494,285 | $215 per sq ft |
| Pennsylvania | $412,707 | $363,182 – $474,613 | $206 per sq ft |
| Rhode Island | $424,237 | $373,329 – $487,873 | $212 per sq ft |
| South Carolina | $373,153 | $328,375 – $429,126 | $187 per sq ft |
| South Dakota | $371,671 | $327,070 – $427,422 | $186 per sq ft |
| Tennessee | $373,728 | $328,881 – $429,787 | $187 per sq ft |
| Texas | $368,129 | $323,954 – $423,348 | $184 per sq ft |
| Utah | $384,511 | $338,370 – $442,188 | $192 per sq ft |
| Vermont | $411,478 | $362,101 – $473,200 | $206 per sq ft |
| Virginia | $384,143 | $338,046 – $441,764 | $192 per sq ft |
| Washington | $464,041 | $408,356 – $533,647 | $232 per sq ft |
| West Virginia | $374,976 | $329,979 – $431,222 | $187 per sq ft |
| Wisconsin | $411,479 | $362,102 – $473,201 | $206 per sq ft |
| Wyoming | $391,750 | $344,740 – $450,513 | $196 per sq ft |
New Home Construction cost by province — Canada (CAD)
Most expensive: Nunavut (C$826,142), Northwest Territories (C$731,566), Yukon (C$692,716). Least expensive: Manitoba (C$551,720), Prince Edward Island (C$553,582), Alberta (C$555,200).
| Province | Typical cost | Range | Unit price |
|---|---|---|---|
| Alberta | C$555,200 | C$488,576 – C$638,480 | C$278 per sq ft |
| British Columbia | C$620,912 | C$546,403 – C$714,049 | C$310 per sq ft |
| Manitoba | C$551,720 | C$485,514 – C$634,478 | C$276 per sq ft |
| New Brunswick | C$563,204 | C$495,620 – C$647,685 | C$282 per sq ft |
| Newfoundland and Labrador | C$599,117 | C$527,223 – C$688,985 | C$300 per sq ft |
| Nova Scotia | C$577,512 | C$508,211 – C$664,139 | C$289 per sq ft |
| Ontario | C$599,517 | C$527,575 – C$689,445 | C$300 per sq ft |
| Prince Edward Island | C$553,582 | C$487,152 – C$636,619 | C$277 per sq ft |
| Quebec | C$606,072 | C$533,343 – C$696,983 | C$303 per sq ft |
| Saskatchewan | C$556,098 | C$489,366 – C$639,513 | C$278 per sq ft |
| Yukon | C$692,716 | C$609,590 – C$796,623 | C$346 per sq ft |
| Northwest Territories | C$731,566 | C$643,778 – C$841,301 | C$366 per sq ft |
| Nunavut | C$826,142 | C$727,005 – C$950,063 | C$413 per sq ft |
New Home Construction cost by state — Australia (AUD)
Most expensive: Western Australia (A$676,850), Australian Capital Territory (A$676,773), Northern Territory (A$675,070). Least expensive: South Australia (A$615,717), Tasmania (A$616,084), Queensland (A$629,398).
| State | Typical cost | Range | Unit price |
|---|---|---|---|
| New South Wales | A$649,359 | A$571,436 – A$746,763 | A$3,495 per m² |
| Victoria | A$632,807 | A$556,870 – A$727,728 | A$3,406 per m² |
| Queensland | A$629,398 | A$553,870 – A$723,808 | A$3,387 per m² |
| South Australia | A$615,717 | A$541,831 – A$708,075 | A$3,314 per m² |
| Western Australia | A$676,850 | A$595,628 – A$778,378 | A$3,643 per m² |
| Tasmania | A$616,084 | A$542,154 – A$708,497 | A$3,316 per m² |
| Northern Territory | A$675,070 | A$594,062 – A$776,331 | A$3,633 per m² |
| Australian Capital Territory | A$676,773 | A$595,560 – A$778,289 | A$3,642 per m² |
How much does a new home construction cost in the U.S.?
Based on current the U.S. labor rates and material prices, a typical new home construction costs about $406,686. Most projects fall between $357,884 and $467,689, or roughly $203 per sq ft. This example assumes: living area 2,000 sq ft, stories 1 story, bedrooms / baths 3 / 2, foundation Slab on grade.
Cost by finish level
| Finish level | Estimated cost | Typical range |
|---|---|---|
| Economy (budget) | $355,554 | $312,888 – $408,887 |
| Standard (mid-range) | $406,686 | $357,884 – $467,689 |
| Premium (high-end) | $526,235 | $463,087 – $605,170 |
Cost by project size
| Project size | Estimated cost |
|---|---|
| 1,500 sq ft | $339,164 |
| 2,000 sq ft | $406,686 |
| 2,500 sq ft | $473,590 |
| 3,500 sq ft | $605,041 |
Where the money goes
- Framing & sheathing$59,805 (19%)
- Interior finishes$35,733 (11%)
- Exterior walls, windows & doors$30,220 (10%)
- Garage$25,982 (8%)
- Site work, permits & utilities$25,833 (8%)
- Kitchen$25,273 (8%)
- Insulation & drywall$23,833 (8%)
- Foundation$19,059 (6%)
Materials $154,497 · Labor $133,619 (2,215 hours) · Equipment, disposal & permits $27,146 — before contingency, contractor overhead & profit and tax.
Labor rates for this project in the U.S. (national average)
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Carpenter | 932 | $31.55 | $63.10 |
| Construction laborer | 260 | $25.02 | $50.04 |
| Drywall installer | 190 | $30.58 | $61.16 |
| Electrician | 156 | $34.37 | $68.74 |
| Cement mason / concrete finisher | 115 | $28.87 | $57.74 |
| Painter | 109 | $26.64 | $53.28 |
| Plumber | 100 | $34.70 | $69.40 |
| Roofer | 76 | $27.95 | $55.90 |
| HVAC technician | 76 | $31.14 | $62.28 |
| Tile & stone setter | 57 | $28.49 | $56.98 |
| Floor layer | 49 | $29.69 | $59.38 |
| Insulation worker | 42 | $26.32 | $52.64 |
| Landscaper / hardscape | 29 | $20.33 | $40.66 |
| Equipment operator | 25 | $31.87 | $63.74 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a new home construction includes
Building a new home is usually priced per square foot of living area, but the real cost depends on the foundation, the number of stories, the roof and siding you choose and the finish level inside. Site work and utility hook-ups are often forgotten in early budgets — this calculator includes them.
Main cost factors
- Size and number of stories
- Foundation type (slab, crawlspace, basement)
- Finish level of kitchens, baths and flooring
- Roof and siding material
- Site work and utility connections
How to save money
- A simple rectangular footprint with a gable roof is the cheapest shape to frame and roof.
- Two stories cost less per square foot than one story of the same area — less foundation and roof.
- Choose stock window sizes and pre-hung doors to avoid custom lead times.
- Get the lot surveyed and soil-tested before design — poor soil can add thousands to the foundation.
Timeline
7–12 months from permit to move-in for a typical 2,000 sq ft home.
Permits
A building permit, plan review and separate electrical, plumbing and mechanical permits are required. Impact and utility connection fees vary widely by city.
Frequently asked questions
How much does a new home construction cost in the US?
A typical new home construction in the US costs about $406,686, with most projects between $357,884 and $467,689. Economy finishes start around $355,554 and premium projects reach $526,235. That is about $203 per sq ft.
How much of the cost is labor?
Labor is about 42% of the direct cost (2,215 work hours) for a typical project in the US. Materials are $154,497 and equipment, disposal and permits $27,146, before contingency, contractor overhead and tax.
How long does a new home construction take?
7–12 months from permit to move-in for a typical 2,000 sq ft home.
Do I need a permit for a new home construction?
A building permit, plan review and separate electrical, plumbing and mechanical permits are required. Impact and utility connection fees vary widely by city.
What is not included in the estimate?
Land, architect fees beyond basic plans, furniture, window coverings, pools and major landscaping are not included. Add them separately.
Is it cheaper to build or buy?
In most markets building costs more per square foot than buying an existing home, but you get new systems, energy efficiency and your own layout with fewer repairs for years.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.