Whole-Home Renovation Cost Calculator — Queensland
Average whole-home renovation cost in Queensland: A$164,363 (typical range A$144,639–A$189,017, A$1,608 per m²). Enter your own sizes below for an itemized estimate. Updated November 2026
Loading calculator…
How much does a whole-home renovation cost in Queensland?
Based on current Queensland labor rates and material prices, a typical whole-home renovation costs about A$164,363. Most projects fall between A$144,639 and A$189,017, or roughly A$1,608 per m². This example assumes: floor area 102 m², rooms 4, bathrooms 2, condition Bare shell (new build, nothing inside).
Cost by finish level
| Finish level | Estimated cost | Typical range |
|---|---|---|
| Economy (budget) | A$140,253 | A$123,423 – A$161,291 |
| Standard (mid-range) | A$164,363 | A$144,639 – A$189,017 |
| Premium (high-end) | A$223,450 | A$196,636 – A$256,968 |
Cost by project size
| Project size | Estimated cost |
|---|---|
| 56 m², 2 rooms, 1 bathrooms | A$99,032 |
| 102 m², 4 rooms, 2 bathrooms | A$164,363 |
| 186 m², 6 rooms, 3 bathrooms | A$255,812 |
Where the money goes
- Bathroom & kitchen fixturesA$23,289 (20%)
- Wall plastering & floor screedA$14,703 (12%)
- Partition wallsA$13,565 (11%)
- TileA$12,095 (10%)
- Electrical wiringA$9,570 (8%)
- PaintingA$9,174 (8%)
- Electrical fixtures & lightingA$7,092 (6%)
- Plumbing rough-inA$6,442 (5%)
Materials A$50,139 · Labor A$62,662 (604 hours) · Equipment, disposal & permits A$5,318 — before contingency, contractor overhead & profit and tax.
Queensland vs. Australia average
A typical whole-home renovation in Queensland costs 2% less than the Australia average (A$164,363 vs. A$167,765). The difference comes mainly from local wages — a carpenter earns on average A$51.14 per hour in Queensland — and from regional material prices and GST of 10%.
Whole-Home Renovation in Queensland: local factors
Queensland ranks 6th of 8 states and territories for whole-home renovation cost (1 = most expensive) — among the most affordable.
| Nearby region | Typical cost | vs. Queensland |
|---|---|---|
| Queensland | A$164,363 | — |
| New South Wales | A$169,598 | +3% |
| Northern Territory | A$174,967 | +6% |
| South Australia | A$160,621 | -2% |
Permits & contractor licensing in Queensland
- Contractor license: Builders and trades must be licensed or registered in Queensland, and most states require home warranty insurance above a contract value.
- Building code: Work must comply with the National Construction Code (NCC) and Australian Standards.
- Permits: Building approval comes from your council or a private building certifier.
Rules vary by city — always confirm with your local building department before work starts.
Labor rates for this project in Queensland
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Brick / block mason | 99 | A$52.17 | A$104.34 |
| Electrician | 98 | A$59.33 | A$118.66 |
| Drywall installer | 94 | A$48.59 | A$97.18 |
| Tile & stone setter | 83 | A$50.12 | A$100.24 |
| Painter | 80 | A$45.01 | A$90.02 |
| Plumber | 67 | A$58.30 | A$116.60 |
| Carpenter | 39 | A$51.14 | A$102.28 |
| Floor layer | 22 | A$47.56 | A$95.12 |
| Cement mason / concrete finisher | 22 | A$50.12 | A$100.24 |
- Labor wages: Australian Bureau of Statistics (ABS), Average Weekly Earnings — construction industry, adjusted by state — data period May 2026, last checked November 21, 2026.
- Material prices & exchange rate: North American average material prices converted with European Central Bank reference rates (Frankfurter API) and a regional price factor — data period 2026-11-20, last checked November 21, 2026.
What a whole-home renovation includes
A whole-home renovation covers everything inside: walls, electrical and plumbing rough-in, heating, plaster, screed, drywall, waterproofing, tile, paint, flooring, doors, lighting and bathroom fixtures. Starting from a bare shell costs the most; a cosmetic refresh the least.
Main cost factors
- Floor area and number of rooms
- Starting condition (shell, dated, good)
- Number of bathrooms
- Finish package
- Electrical, plumbing and heating scope
How to save money
- Finish all “wet” work (plaster, screed, tile) before flooring and paint.
- Buy tile, flooring and doors early — delivery delays stop the whole job.
- Keep 10% of the budget for surprises behind walls.
- Electrical and plumbing points are cheaper to add before plastering than later.
Timeline
2–4 months for a 1,000–1,500 sq ft home or apartment.
Permits
Electrical, plumbing and any wall changes need permits; cosmetic work usually does not.
Frequently asked questions
How much does a whole-home renovation cost in Queensland?
A typical whole-home renovation in Queensland costs about A$164,363, with most projects between A$144,639 and A$189,017. Economy finishes start around A$140,253 and premium projects reach A$223,450. That is about A$1,608 per m².
How much of the cost is labor?
Labor is about 53% of the direct cost (604 work hours) for a typical project in Queensland. Materials are A$50,139 and equipment, disposal and permits A$5,318, before contingency, contractor overhead and tax.
Is a whole-home renovation cheaper in Queensland than in nearby regions?
A typical whole-home renovation costs A$164,363 in Queensland. Among nearby regions, South Australia is the lowest at A$160,621 and Northern Territory the highest at A$174,967. Differences come mostly from local wages, material prices and taxes.
Do I need a licensed contractor in Queensland?
Builders and trades must be licensed or registered in Queensland, and most states require home warranty insurance above a contract value.
How long does a whole-home renovation take?
2–4 months for a 1,000–1,500 sq ft home or apartment.
Do I need a permit for a whole-home renovation?
Electrical, plumbing and any wall changes need permits; cosmetic work usually does not.
How much does it cost to renovate per square foot?
See the cost per square foot under the total. It depends mostly on the starting condition and finish package.
What should I renovate first?
Infrastructure first (wiring, plumbing, heating, windows), then walls and floors, then finishes and fixtures.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.
Whole-Home Renovation cost in other states
Compare whole-home renovation costs in every state, province and territory →