Swimming Pool Cost Calculator — Nebraska
Average swimming pool cost in Nebraska: $86,904 (typical range $76,476–$99,940, $170 per sq ft of water surface). Enter your own sizes below for an itemized estimate. Updated November 2026
Loading calculator…
How much does a swimming pool cost in Nebraska?
Based on current Nebraska labor rates and material prices, a typical swimming pool costs about $86,904. Most projects fall between $76,476 and $99,940, or roughly $170 per sq ft of water surface. This example assumes: pool size 32 ft × 16 ft, water surface 512 sq ft, volume 19,149 gal, type Concrete / gunite.
Cost by project size
| Project size | Estimated cost |
|---|---|
| 24 × 12 ft | $70,261 |
| 32 × 16 ft | $86,904 |
| 40 × 20 ft | $105,906 |
Where the money goes
- Pool structure$33,223 (50%)
- Design, permits & excavation$10,778 (16%)
- Plumbing & equipment$7,884 (12%)
- Safety fence & gate$5,859 (9%)
- Pool deck$5,156 (8%)
- Electrical$2,865 (4%)
- Start-up$1,264 (2%)
Materials $38,396 · Labor $18,272 (340 hours) · Equipment, disposal & permits $10,362 — before contingency, contractor overhead & profit and tax.
Nebraska vs. United States average
A typical swimming pool in Nebraska costs 5% less than the United States average ($86,904 vs. $91,082). The difference comes mainly from local wages — a carpenter earns on average $26.43 per hour in Nebraska — and from regional material prices and Sales tax (materials) of 5.5%.
Swimming Pool in Nebraska: local factors
Nebraska ranks 36th of 51 states for swimming pool cost (1 = most expensive) — among the most affordable.
| Nearby state | Typical cost | vs. Nebraska |
|---|---|---|
| Nebraska | $86,904 | — |
| Colorado | $91,380 | +5% |
| Iowa | $88,928 | +2% |
| Kansas | $87,710 | +1% |
| Missouri | $90,682 | +4% |
| South Dakota | $85,832 | -1% |
| Wyoming | $90,206 | +4% |
Permits & contractor licensing in Nebraska
- Contractor license: Licensing rules in Nebraska depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.
- Building code: Building codes in Nebraska are based on the International Residential Code, adopted with local amendments.
- Permits: Building permits are issued by your city or county building department.
Rules vary by city — always confirm with your local building department before work starts.
Labor rates for this project in Nebraska
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Cement mason / concrete finisher | 114 | $25.17 | $50.34 |
| Brick / block mason | 58 | $28.62 | $57.24 |
| Ironworker / welder | 40 | $29.76 | $59.52 |
| Construction laborer | 32 | $23.25 | $46.50 |
| Plumber | 32 | $31.59 | $63.18 |
| Fence erector | 26 | $21.39 | $42.78 |
| Equipment operator | 22 | $28.07 | $56.14 |
| Electrician | 16 | $30.75 | $61.50 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a swimming pool includes
An in-ground pool includes design and permits, excavation and haul-off, the pool structure, plumbing and equipment, electrical bonding, coping and tile, a deck and a code-compliant safety fence. Concrete pools are the most flexible and most expensive; fiberglass is fastest to install.
Main cost factors
- Pool type and size
- Depth and shape
- Heater and automation
- Deck area and material
- Safety fencing
How to save money
- A simple rectangle costs less than a freeform shape with many curves.
- A variable-speed pump pays for itself in lower electricity bills.
- A heat pump is cheaper to run than a gas heater in warm climates.
- Budget for fencing, landscaping and higher insurance.
Timeline
6–12 weeks for concrete; 3–5 weeks for fiberglass.
Permits
A pool permit, electrical permit and a compliant barrier/fence are required almost everywhere.
Frequently asked questions
How much does a swimming pool cost in Nebraska?
A typical swimming pool in Nebraska costs about $86,904, with most projects between $76,476 and $99,940. That is about $170 per sq ft of water surface.
How much of the cost is labor?
Labor is about 27% of the direct cost (340 work hours) for a typical project in Nebraska. Materials are $38,396 and equipment, disposal and permits $10,362, before contingency, contractor overhead and tax.
Is a swimming pool cheaper in Nebraska than in nearby states?
A typical swimming pool costs $86,904 in Nebraska. Among nearby states, South Dakota is the lowest at $85,832 and Colorado the highest at $91,380. Differences come mostly from local wages, material prices and taxes.
Do I need a licensed contractor in Nebraska?
Licensing rules in Nebraska depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.
How long does a swimming pool take?
6–12 weeks for concrete; 3–5 weeks for fiberglass.
Do I need a permit for a swimming pool?
A pool permit, electrical permit and a compliant barrier/fence are required almost everywhere.
Concrete, vinyl or fiberglass — which is cheapest?
Vinyl liner pools usually have the lowest upfront cost, concrete the highest. Switch the pool type in the calculator to compare.
What does a pool cost to maintain?
Plan for chemicals, electricity, and periodic resurfacing or liner replacement.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.