Swimming Pool Cost Calculator — Illinois
Average swimming pool cost in Illinois: $101,293 (typical range $89,138–$116,487, $198 per sq ft of water surface). Enter your own sizes below for an itemized estimate. Updated November 2026
Loading calculator…
How much does a swimming pool cost in Illinois?
Based on current Illinois labor rates and material prices, a typical swimming pool costs about $101,293. Most projects fall between $89,138 and $116,487, or roughly $198 per sq ft of water surface. This example assumes: pool size 32 ft × 16 ft, water surface 512 sq ft, volume 19,149 gal, type Concrete / gunite.
Cost by project size
| Project size | Estimated cost |
|---|---|
| 24 × 12 ft | $81,908 |
| 32 × 16 ft | $101,293 |
| 40 × 20 ft | $123,427 |
Where the money goes
- Pool structure$39,098 (50%)
- Design, permits & excavation$12,253 (16%)
- Plumbing & equipment$9,096 (12%)
- Safety fence & gate$6,619 (8%)
- Pool deck$6,113 (8%)
- Electrical$3,415 (4%)
- Start-up$1,467 (2%)
Materials $40,746 · Labor $26,318 (340 hours) · Equipment, disposal & permits $10,996 — before contingency, contractor overhead & profit and tax.
Illinois vs. United States average
A typical swimming pool in Illinois costs 11% more than the United States average ($101,293 vs. $91,082). The difference comes mainly from local wages — a carpenter earns on average $38.62 per hour in Illinois — and from regional material prices and Sales tax (materials) of 6.25%.
Labor rates for this project in Illinois
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Cement mason / concrete finisher | 114 | $37.40 | $74.80 |
| Brick / block mason | 58 | $40.79 | $81.58 |
| Ironworker / welder | 40 | $42.15 | $84.30 |
| Construction laborer | 32 | $32.51 | $65.02 |
| Plumber | 32 | $44.91 | $89.82 |
| Fence erector | 26 | $30.30 | $60.60 |
| Equipment operator | 22 | $39.75 | $79.50 |
| Electrician | 16 | $44.34 | $88.68 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a swimming pool includes
An in-ground pool includes design and permits, excavation and haul-off, the pool structure, plumbing and equipment, electrical bonding, coping and tile, a deck and a code-compliant safety fence. Concrete pools are the most flexible and most expensive; fiberglass is fastest to install.
Main cost factors
- Pool type and size
- Depth and shape
- Heater and automation
- Deck area and material
- Safety fencing
How to save money
- A simple rectangle costs less than a freeform shape with many curves.
- A variable-speed pump pays for itself in lower electricity bills.
- A heat pump is cheaper to run than a gas heater in warm climates.
- Budget for fencing, landscaping and higher insurance.
Timeline
6–12 weeks for concrete; 3–5 weeks for fiberglass.
Permits
A pool permit, electrical permit and a compliant barrier/fence are required almost everywhere.
Frequently asked questions
How much does a swimming pool cost in Illinois?
A typical swimming pool in Illinois costs about $101,293, with most projects between $89,138 and $116,487. That is about $198 per sq ft of water surface.
How much of the cost is labor?
Labor is about 34% of the direct cost (340 work hours) for a typical project in Illinois. Materials are $40,746 and equipment, disposal and permits $10,996, before contingency, contractor overhead and tax.
How long does a swimming pool take?
6–12 weeks for concrete; 3–5 weeks for fiberglass.
Do I need a permit for a swimming pool?
A pool permit, electrical permit and a compliant barrier/fence are required almost everywhere.
Concrete, vinyl or fiberglass — which is cheapest?
Vinyl liner pools usually have the lowest upfront cost, concrete the highest. Switch the pool type in the calculator to compare.
What does a pool cost to maintain?
Plan for chemicals, electricity, and periodic resurfacing or liner replacement.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.
Swimming Pool cost in other states
Compare swimming pool costs in every state, province and territory →