Average swimming pool cost in Ohio: $91,276 (typical range $80,323–$104,967, $178 per sq ft of water surface). Enter your own sizes below for an itemized estimate. Updated November 2026
Loading calculator…
How much does a swimming pool cost in Ohio?
Based on current Ohio labor rates and material prices, a typical swimming pool costs about $91,276. Most projects fall between $80,323 and $104,967, or roughly $178 per sq ft of water surface. This example assumes: pool size 32 ft × 16 ft, water surface 512 sq ft, volume 19,149 gal, type Concrete / gunite.
Cost by project size
| Project size | Estimated cost |
|---|---|
| 24 × 12 ft | $73,744 |
| 32 × 16 ft | $91,276 |
| 40 × 20 ft | $111,293 |
Where the money goes
- Pool structure$35,213 (50%)
- Design, permits & excavation$11,240 (16%)
- Plumbing & equipment$8,067 (11%)
- Safety fence & gate$6,041 (9%)
- Pool deck$5,523 (8%)
- Electrical$2,959 (4%)
- Start-up$1,350 (2%)
Materials $38,785 · Labor $21,140 (340 hours) · Equipment, disposal & permits $10,467 — before contingency, contractor overhead & profit and tax.
Ohio vs. United States average
A typical swimming pool in Ohio costs 0% less than the United States average ($91,276 vs. $91,082). The difference comes mainly from local wages — a carpenter earns on average $30.09 per hour in Ohio — and from regional material prices and Sales tax (materials) of 5.75%.
Labor rates for this project in Ohio
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Cement mason / concrete finisher | 114 | $30.67 | $61.34 |
| Brick / block mason | 58 | $33.36 | $66.72 |
| Ironworker / welder | 40 | $33.29 | $66.58 |
| Construction laborer | 32 | $28.03 | $56.06 |
| Plumber | 32 | $33.51 | $67.02 |
| Fence erector | 26 | $23.93 | $47.86 |
| Equipment operator | 22 | $31.40 | $62.80 |
| Electrician | 16 | $33.09 | $66.18 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a swimming pool includes
An in-ground pool includes design and permits, excavation and haul-off, the pool structure, plumbing and equipment, electrical bonding, coping and tile, a deck and a code-compliant safety fence. Concrete pools are the most flexible and most expensive; fiberglass is fastest to install.
Main cost factors
- Pool type and size
- Depth and shape
- Heater and automation
- Deck area and material
- Safety fencing
How to save money
- A simple rectangle costs less than a freeform shape with many curves.
- A variable-speed pump pays for itself in lower electricity bills.
- A heat pump is cheaper to run than a gas heater in warm climates.
- Budget for fencing, landscaping and higher insurance.
Timeline
6–12 weeks for concrete; 3–5 weeks for fiberglass.
Permits
A pool permit, electrical permit and a compliant barrier/fence are required almost everywhere.
Frequently asked questions
How much does a swimming pool cost in Ohio?
A typical swimming pool in Ohio costs about $91,276, with most projects between $80,323 and $104,967. That is about $178 per sq ft of water surface.
How much of the cost is labor?
Labor is about 30% of the direct cost (340 work hours) for a typical project in Ohio. Materials are $38,785 and equipment, disposal and permits $10,467, before contingency, contractor overhead and tax.
How long does a swimming pool take?
6–12 weeks for concrete; 3–5 weeks for fiberglass.
Do I need a permit for a swimming pool?
A pool permit, electrical permit and a compliant barrier/fence are required almost everywhere.
Concrete, vinyl or fiberglass — which is cheapest?
Vinyl liner pools usually have the lowest upfront cost, concrete the highest. Switch the pool type in the calculator to compare.
What does a pool cost to maintain?
Plan for chemicals, electricity, and periodic resurfacing or liner replacement.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.