Electrical Rewiring & Panel Cost Calculator — Ohio
Average electrical rewiring & panel cost in Ohio: $28,071 (typical range $24,702–$32,282, $16 per sq ft). Enter your own sizes below for an itemized estimate. Updated November 2026
Loading calculator…
How much does a electrical rewiring & panel cost in Ohio?
Based on current Ohio labor rates and material prices, a typical electrical rewiring & panel costs about $28,071. Most projects fall between $24,702 and $32,282, or roughly $16 per sq ft. This example assumes: home size 1,800 sq ft, scope Full rewire, panel 200 A, ev charger No.
Cost by project size
| Project size | Estimated cost |
|---|---|
| 900 sq ft | $16,659 |
| 1,800 sq ft | $28,071 |
| 3,600 sq ft | $50,895 |
Where the money goes
- Rewiring$13,431 (61%)
- Wall repair$4,140 (19%)
- Service & panel$3,098 (14%)
- Extras$904 (4%)
- Permit & inspection$319 (1%)
Materials $6,555 · Labor $14,801 (230 hours) · Equipment, disposal & permits $536 — before contingency, contractor overhead & profit and tax.
Ohio vs. United States average
A typical electrical rewiring & panel in Ohio costs 3% less than the United States average ($28,071 vs. $28,860). The difference comes mainly from local wages — a carpenter earns on average $30.09 per hour in Ohio — and from regional material prices and Sales tax (materials) of 5.75%.
Labor rates for this project in Ohio
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Electrician | 171 | $33.09 | $66.18 |
| Drywall installer | 60 | $29.36 | $58.72 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a electrical rewiring & panel includes
Rewiring includes a new panel and service, new circuits fished through walls, outlets, switches and detectors, plus patching the access holes. Plaster walls take longer than drywall.
Main cost factors
- Home size
- Panel size
- Full or partial rewire
- Wall repair after rewiring
- EV charger
How to save money
- Upgrade to a 200 A panel if you plan an EV charger, heat pump or induction cooking.
- Do rewiring before painting and flooring.
- Add outlets and USB-C receptacles while walls are open.
- Whole-home surge protection is inexpensive insurance.
Timeline
3–10 days for a full rewire.
Permits
Electrical permits and inspections are always required; utility coordination is needed for service upgrades.
Frequently asked questions
How much does a electrical rewiring & panel cost in Ohio?
A typical electrical rewiring & panel in Ohio costs about $28,071, with most projects between $24,702 and $32,282. That is about $16 per sq ft.
How much of the cost is labor?
Labor is about 68% of the direct cost (230 work hours) for a typical project in Ohio. Materials are $6,555 and equipment, disposal and permits $536, before contingency, contractor overhead and tax.
How long does a electrical rewiring & panel take?
3–10 days for a full rewire.
Do I need a permit for a electrical rewiring & panel?
Electrical permits and inspections are always required; utility coordination is needed for service upgrades.
Do I need to rewire an old house?
Homes with knob-and-tube, aluminum branch wiring or a fuse box are strong candidates.
How much does a panel upgrade cost?
Choose “Panel upgrade only” to see just the panel and service cost.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.
Electrical Rewiring & Panel cost in other states
Compare electrical rewiring & panel costs in every state, province and territory →