Concrete Driveway & Slab Cost Calculator — Oregon
Average concrete driveway & slab cost in Oregon: $11,553 (typical range $10,167–$13,286, $14 per sq ft). Enter your own sizes below for an itemized estimate. Updated November 2026
Loading calculator…
Get up to 3 free quotes from Oregon pros
- Compare real prices with your estimate
- Local, licensed and insured contractors
- Takes 30 seconds — your estimate is attached
How much does a concrete driveway & slab cost in Oregon?
Based on current Oregon labor rates and material prices, a typical concrete driveway & slab costs about $11,553. Most projects fall between $10,167 and $13,286, or roughly $14 per sq ft. This example assumes: size 40 ft × 20 ft, area 800 sq ft, concrete 10.5 cu yd, thickness 4".
Cost by project size
| Project size | Estimated cost |
|---|---|
| 20 × 10 ft | $3,580 |
| 24 × 24 ft | $8,813 |
| 40 × 20 ft | $11,553 |
| 50 × 24 ft | $17,035 |
Where the money goes
- Concrete$6,129 (67%)
- Base & forms$2,833 (31%)
- Permit$171 (2%)
Materials $4,155 · Labor $4,150 (66 hours) · Equipment, disposal & permits $827 — before contingency, contractor overhead & profit and tax.
Oregon vs. United States average
A typical concrete driveway & slab in Oregon costs 6% more than the United States average ($11,553 vs. $10,880). The difference comes mainly from local wages — a carpenter earns on average $34.08 per hour in Oregon — and from regional material prices and Sales tax (materials) of 0%.
Concrete Driveway & Slab in Oregon: local factors
Oregon ranks 13th of 51 states for concrete driveway & slab cost (1 = most expensive) — among the most expensive.
| Nearby state | Typical cost | vs. Oregon |
|---|---|---|
| Oregon | $11,553 | — |
| California | $12,535 | +8% |
| Idaho | $10,602 | -8% |
| Nevada | $11,409 | -1% |
| Washington | $12,775 | +11% |
Permits & contractor licensing in Oregon
- Contractor license: Licensing rules in Oregon depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.
- Building code: Building codes in Oregon are based on the International Residential Code, adopted with local amendments.
- Permits: Building permits are issued by your city or county building department.
Rules vary by city — always confirm with your local building department before work starts.
Labor rates for this project in Oregon
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Cement mason / concrete finisher | 42 | $33.78 | $67.56 |
| Construction laborer | 24 | $26.79 | $53.58 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a concrete driveway & slab includes
Concrete flatwork costs depend on area, thickness, reinforcement and finish. A compacted gravel base, forms, ready-mix delivery and finishing labor are included; stamped and colored finishes add materials and time.
Main cost factors
- Area and thickness
- Reinforcement
- Decorative finish
- Removing old concrete
- Access for the truck
How to save money
- 5–6 inches thickness for driveways with heavy vehicles.
- Small pours under ~8 cubic yards pay a short-load fee — combine projects.
- Seal the concrete after curing to prevent salt and stain damage.
- Control joints every 8–12 ft prevent random cracks.
Timeline
2–4 days, plus 7 days before driving on it.
Permits
Driveway and curb-cut permits are common; check before pouring.
Frequently asked questions
How much does a concrete driveway & slab cost in Oregon?
A typical concrete driveway & slab in Oregon costs about $11,553, with most projects between $10,167 and $13,286. That is about $14 per sq ft.
How much of the cost is labor?
Labor is about 45% of the direct cost (66 work hours) for a typical project in Oregon. Materials are $4,155 and equipment, disposal and permits $827, before contingency, contractor overhead and tax.
Is a concrete driveway & slab cheaper in Oregon than in nearby states?
A typical concrete driveway & slab costs $11,553 in Oregon. Among nearby states, Idaho is the lowest at $10,602 and Washington the highest at $12,775. Differences come mostly from local wages, material prices and taxes.
Do I need a licensed contractor in Oregon?
Licensing rules in Oregon depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.
How long does a concrete driveway & slab take?
2–4 days, plus 7 days before driving on it.
Do I need a permit for a concrete driveway & slab?
Driveway and curb-cut permits are common; check before pouring.
How many cubic yards do I need?
The breakdown shows the volume for your size and thickness with 6% extra.
Concrete or pavers?
Concrete is cheaper per square foot; pavers are easier to repair.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.
Concrete Driveway & Slab cost in other states
Compare concrete driveway & slab costs in every state, province and territory →