Paver Patio Cost Calculator — Oregon

Average paver patio cost in Oregon: $6,655 (typical range $5,856–$7,653, $22 per sq ft). Enter your own sizes below for an itemized estimate. Updated November 2026

Loading calculator…

How much does a paver patio cost in Oregon?

Based on current Oregon labor rates and material prices, a typical paver patio costs about $6,655. Most projects fall between $5,856 and $7,653, or roughly $22 per sq ft. This example assumes: patio area 300 sq ft, paver Concrete pavers, base 6".

Cost by project size

Project sizeEstimated cost
150 sq ft$3,742
300 sq ft$6,655
600 sq ft$12,936

Where the money goes

  • Pavers$2,939 (56%)
  • Excavation$1,215 (23%)
  • Base$1,106 (21%)

Materials $2,404 · Labor $1,881 (41 hours) · Equipment, disposal & permits $975 — before contingency, contractor overhead & profit and tax.

Oregon vs. United States average

A typical paver patio in Oregon costs 5% more than the United States average ($6,655 vs. $6,312). The difference comes mainly from local wages — a carpenter earns on average $34.08 per hour in Oregon — and from regional material prices and Sales tax (materials) of 0%.

Paver Patio in Oregon: local factors

Oregon ranks 13th of 51 states for paver patio cost (1 = most expensive) — among the most expensive.

Nearby stateTypical costvs. Oregon
Oregon$6,655—
California$7,117+7%
Idaho$6,081-9%
Nevada$6,526-2%
Washington$7,145+7%

Permits & contractor licensing in Oregon

  • Contractor license: Licensing rules in Oregon depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.
  • Building code: Building codes in Oregon are based on the International Residential Code, adopted with local amendments.
  • Permits: Building permits are issued by your city or county building department.

Rules vary by city — always confirm with your local building department before work starts.

Labor rates for this project in Oregon

TradeHoursAvg. wage / hourInstalled rate / hour
Landscaper / hardscape41$23.22$46.44
  • Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
  • Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.

What a paver patio includes

A paver patio is mostly excavation and base work: geotextile, crushed gravel, bedding sand, then the pavers, edge restraint and polymeric joint sand. A good base is what keeps pavers level for decades.

Main cost factors

  • Patio area
  • Paver type
  • Base depth
  • Borders and edging
  • Steps or seat walls

How to save money

  • Do not skimp on base depth on clay soils.
  • Simple running-bond patterns waste less paver material.
  • Permeable pavers can reduce storm-water fees in some cities.
  • Seat walls and steps add the most cost per square foot.

Timeline

2–5 days.

Permits

Usually not required for ground-level patios; check lot coverage rules.

Frequently asked questions

How much does a paver patio cost in Oregon?

A typical paver patio in Oregon costs about $6,655, with most projects between $5,856 and $7,653. That is about $22 per sq ft.

How much of the cost is labor?

Labor is about 36% of the direct cost (41 work hours) for a typical project in Oregon. Materials are $2,404 and equipment, disposal and permits $975, before contingency, contractor overhead and tax.

Is a paver patio cheaper in Oregon than in nearby states?

A typical paver patio costs $6,655 in Oregon. Among nearby states, Idaho is the lowest at $6,081 and Washington the highest at $7,145. Differences come mostly from local wages, material prices and taxes.

Do I need a licensed contractor in Oregon?

Licensing rules in Oregon depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.

How long does a paver patio take?

2–5 days.

Do I need a permit for a paver patio?

Usually not required for ground-level patios; check lot coverage rules.

How much base gravel do I need?

See the “Base” category for cubic yards for your base depth.

How long do paver patios last?

25–50 years with occasional re-sanding of joints.

Can I change the contractor markup or contingency?

Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.

Paver Patio cost in other states

Compare paver patio costs in every state, province and territory →

More cost calculators for Oregon

Choose your location

AL AlabamaAK AlaskaAZ ArizonaAR ArkansasCA CaliforniaCO ColoradoCT ConnecticutDE DelawareDC District of ColumbiaFL FloridaGA GeorgiaHI HawaiiID IdahoIL IllinoisIN IndianaIA IowaKS KansasKY KentuckyLA LouisianaME MaineMD MarylandMA MassachusettsMI MichiganMN MinnesotaMS MississippiMO MissouriMT MontanaNE NebraskaNV NevadaNH New HampshireNJ New JerseyNM New MexicoNY New YorkNC North CarolinaND North DakotaOH OhioOK OklahomaOR OregonPA PennsylvaniaRI Rhode IslandSC South CarolinaSD South DakotaTN TennesseeTX TexasUT UtahVT VermontVA VirginiaWA WashingtonWV West VirginiaWI WisconsinWY Wyoming