Paver Patio Cost Calculator — Oregon
Average paver patio cost in Oregon: $6,655 (typical range $5,856–$7,653, $22 per sq ft). Enter your own sizes below for an itemized estimate. Updated November 2026
Loading calculator…
How much does a paver patio cost in Oregon?
Based on current Oregon labor rates and material prices, a typical paver patio costs about $6,655. Most projects fall between $5,856 and $7,653, or roughly $22 per sq ft. This example assumes: patio area 300 sq ft, paver Concrete pavers, base 6".
Cost by project size
| Project size | Estimated cost |
|---|---|
| 150 sq ft | $3,742 |
| 300 sq ft | $6,655 |
| 600 sq ft | $12,936 |
Where the money goes
- Pavers$2,939 (56%)
- Excavation$1,215 (23%)
- Base$1,106 (21%)
Materials $2,404 · Labor $1,881 (41 hours) · Equipment, disposal & permits $975 — before contingency, contractor overhead & profit and tax.
Oregon vs. United States average
A typical paver patio in Oregon costs 5% more than the United States average ($6,655 vs. $6,312). The difference comes mainly from local wages — a carpenter earns on average $34.08 per hour in Oregon — and from regional material prices and Sales tax (materials) of 0%.
Paver Patio in Oregon: local factors
Oregon ranks 13th of 51 states for paver patio cost (1 = most expensive) — among the most expensive.
| Nearby state | Typical cost | vs. Oregon |
|---|---|---|
| Oregon | $6,655 | — |
| California | $7,117 | +7% |
| Idaho | $6,081 | -9% |
| Nevada | $6,526 | -2% |
| Washington | $7,145 | +7% |
Permits & contractor licensing in Oregon
- Contractor license: Licensing rules in Oregon depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.
- Building code: Building codes in Oregon are based on the International Residential Code, adopted with local amendments.
- Permits: Building permits are issued by your city or county building department.
Rules vary by city — always confirm with your local building department before work starts.
Labor rates for this project in Oregon
| Trade | Hours | Avg. wage / hour | Installed rate / hour |
|---|---|---|---|
| Landscaper / hardscape | 41 | $23.22 | $46.44 |
- Labor wages: U.S. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics — state hourly mean wage by trade — data period May 2025, last checked November 21, 2026.
- Material price index: U.S. BLS Producer Price Index — inputs to construction industries (WPUSI012011), monthly — data period October 2026, last checked November 21, 2026.
What a paver patio includes
A paver patio is mostly excavation and base work: geotextile, crushed gravel, bedding sand, then the pavers, edge restraint and polymeric joint sand. A good base is what keeps pavers level for decades.
Main cost factors
- Patio area
- Paver type
- Base depth
- Borders and edging
- Steps or seat walls
How to save money
- Do not skimp on base depth on clay soils.
- Simple running-bond patterns waste less paver material.
- Permeable pavers can reduce storm-water fees in some cities.
- Seat walls and steps add the most cost per square foot.
Timeline
2–5 days.
Permits
Usually not required for ground-level patios; check lot coverage rules.
Frequently asked questions
How much does a paver patio cost in Oregon?
A typical paver patio in Oregon costs about $6,655, with most projects between $5,856 and $7,653. That is about $22 per sq ft.
How much of the cost is labor?
Labor is about 36% of the direct cost (41 work hours) for a typical project in Oregon. Materials are $2,404 and equipment, disposal and permits $975, before contingency, contractor overhead and tax.
Is a paver patio cheaper in Oregon than in nearby states?
A typical paver patio costs $6,655 in Oregon. Among nearby states, Idaho is the lowest at $6,081 and Washington the highest at $7,145. Differences come mostly from local wages, material prices and taxes.
Do I need a licensed contractor in Oregon?
Licensing rules in Oregon depend on the trade and the size of the job. Electricians and plumbers are licensed in almost every state — always ask for a license number and proof of insurance.
How long does a paver patio take?
2–5 days.
Do I need a permit for a paver patio?
Usually not required for ground-level patios; check lot coverage rules.
How much base gravel do I need?
See the “Base” category for cubic yards for your base depth.
How long do paver patios last?
25–50 years with occasional re-sanding of joints.
Can I change the contractor markup or contingency?
Yes — open “Contingency & contractor markup” in the calculator. Set overhead & profit to 0% if you manage the project yourself and hire trades directly.
Paver Patio cost in other states
Compare paver patio costs in every state, province and territory →